Intake equipment - the main incoming supply
During an EICR there will be visual inspections of the main incoming supply equipment carried out.
The local supply authority will need to be informed of any inadequacies found during the inspection
Typical single phase TNC-S supply in Nottingham
Service Cable
The condition of the mains service cable will be visually inspected for any damage or deterioration that may have occured
Service Head
The condition of the mains service head will be visually inspected for any damage or deterioration that may have occured
Earthing Arrangement
The main earthing conductor will be checked, if it is an adequate PME TNC-S, TNS or TT system and connections are intact
Meter Tails
The condition of the meter tails will be visually inspected for any damage or deterioration that may have occured. There will be checks that the meter cables are adequately supported throughout their length.
Metering Equipment
The condition of the metering equipment will be visually inspected for any damage or deterioration that may have occured
Isolator
The main isolator if present will be checked for adequate rating, any damage and functional switching of all poles whether a typical single phase domestic installation or a larger 3 phase commercial supply.
​
​
Contact us at Niman Electrical,
we are always happy to help.
​